Re: Instruction regarding VO#19 rain chain & cut-off ditch work
This record consists of general correspondence regarding the instruction regarding variation order of rain chain & cut-off ditch work for BRACU new campus project.
Prif Awdur: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Fformat: | General correspondence |
Iaith: | English |
Cyhoeddwyd: |
Brac University
2023
|
Pynciau: | |
Mynediad Ar-lein: | http://hdl.handle.net/10361/20221 |
Eitemau Tebyg
-
VO#019 rain chain & cut-off ditch work
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023) -
Instruction regarding VO#019 rain chain & cut-off ditch work of BRAC University new campus project
gan: Brac University
Cyhoeddwyd: (2023) -
Miscellaneous details for cut-off ditch in the south of utility building (RFA-364_Rev C)
gan: WOHA Designs PTE LTD, et al.
Cyhoeddwyd: (2023) -
Cut-off ditch for UB (Architectural As Built Drawings)
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2024) -
Detail of copper rain chain (RFA-296_Rev A)
gan: WOHA Designs PTE LTD, et al.
Cyhoeddwyd: (2023)