Regarding removing stacked materials for construction purpose
This record consists of general correspondence regarding removing stacked materials for construction of BRACU new campus project.
主要作者: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
格式: | General correspondence |
语言: | English |
出版: |
Brac University
2023
|
主题: | |
在线阅读: | http://hdl.handle.net/10361/20214 |
相似书籍
-
Removal of rebar stacked at the west of the engineer office
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023) -
Regarding safeguarding materials on construction site
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023) -
Regarding construction method of terrazzo
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023) -
Removal of precast piles
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023) -
Regarding the construction source line by DESCO
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023)