Regarding removing stacked materials for construction purpose
This record consists of general correspondence regarding removing stacked materials for construction of BRACU new campus project.
Tác giả chính: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Định dạng: | General correspondence |
Ngôn ngữ: | English |
Được phát hành: |
Brac University
2023
|
Những chủ đề: | |
Truy cập trực tuyến: | http://hdl.handle.net/10361/20214 |
Những quyển sách tương tự
-
Removal of rebar stacked at the west of the engineer office
Bằng: BUCG-ABC Joint Venture (BUCG-ABC JV)
Được phát hành: (2023) -
Regarding safeguarding materials on construction site
Bằng: BUCG-ABC Joint Venture (BUCG-ABC JV)
Được phát hành: (2023) -
Regarding construction method of terrazzo
Bằng: BUCG-ABC Joint Venture (BUCG-ABC JV)
Được phát hành: (2023) -
Removal of precast piles
Bằng: BUCG-ABC Joint Venture (BUCG-ABC JV)
Được phát hành: (2023) -
Regarding the construction source line by DESCO
Bằng: BUCG-ABC Joint Venture (BUCG-ABC JV)
Được phát hành: (2023)