Regarding removing stacked materials for construction purpose
This record consists of general correspondence regarding removing stacked materials for construction of BRACU new campus project.
第一著者: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
フォーマット: | General correspondence |
言語: | English |
出版事項: |
Brac University
2023
|
主題: | |
オンライン・アクセス: | http://hdl.handle.net/10361/20214 |
類似資料
-
Removal of rebar stacked at the west of the engineer office
著者:: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版事項: (2023) -
Regarding safeguarding materials on construction site
著者:: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版事項: (2023) -
Regarding construction method of terrazzo
著者:: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版事項: (2023) -
Removal of precast piles
著者:: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版事項: (2023) -
Regarding the construction source line by DESCO
著者:: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版事項: (2023)