Regarding removing stacked materials for construction purpose
This record consists of general correspondence regarding removing stacked materials for construction of BRACU new campus project.
Auteur principal: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | General correspondence |
Langue: | English |
Publié: |
Brac University
2023
|
Sujets: | |
Accès en ligne: | http://hdl.handle.net/10361/20214 |
Documents similaires
-
Removal of rebar stacked at the west of the engineer office
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2023) -
Regarding safeguarding materials on construction site
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2023) -
Regarding construction method of terrazzo
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2023) -
Removal of precast piles
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2023) -
Regarding the construction source line by DESCO
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2023)