Regarding removing stacked materials for construction purpose
This record consists of general correspondence regarding removing stacked materials for construction of BRACU new campus project.
Main Author: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | General correspondence |
Language: | English |
Published: |
Brac University
2023
|
Subjects: | |
Online Access: | http://hdl.handle.net/10361/20214 |
Similar Items
-
Removal of rebar stacked at the west of the engineer office
by: BUCG-ABC Joint Venture (BUCG-ABC JV)
Published: (2023) -
Regarding safeguarding materials on construction site
by: BUCG-ABC Joint Venture (BUCG-ABC JV)
Published: (2023) -
Regarding construction method of terrazzo
by: BUCG-ABC Joint Venture (BUCG-ABC JV)
Published: (2023) -
Removal of precast piles
by: BUCG-ABC Joint Venture (BUCG-ABC JV)
Published: (2023) -
Regarding the construction source line by DESCO
by: BUCG-ABC Joint Venture (BUCG-ABC JV)
Published: (2023)