Regarding submitting master construction schedule plan
This record consists of general correspondence regarding the submission of master construction schedule plan of BRACU new campus project.
Päätekijä: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Aineistotyyppi: | General correspondence |
Kieli: | English |
Julkaistu: |
Brac University
2023
|
Aiheet: | |
Linkit: | http://hdl.handle.net/10361/20209 |
Samankaltaisia teoksia
-
Regarding submitting the latest construction schedule
Tekijä: BUCG-ABC Joint Venture (BUCG-ABC JV)
Julkaistu: (2023) -
Submission of updated master schedule of BRAC university new campus development project
Tekijä: BUCG-ABC Joint Venture (BUCG-ABC JV)
Julkaistu: (2023) -
Architectural submittal schedule
Tekijä: Brac University
Julkaistu: (2023) -
Clarification for the master construction schedule
Tekijä: Brac University
Julkaistu: (2023) -
Clarification for the master construction schedule of BRAC University new campus project
Tekijä: BUCG-ABC Joint Venture
Julkaistu: (2023)