Cushion replacement in the second reinforcement bracing base course
This record consists of general correspondence regarding cushion replacement in the second reinforcement bracing base course of BRAC University new campus project.
主要作者: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
格式: | General correspondence |
語言: | English |
出版: |
Brac University
2023
|
主題: | |
在線閱讀: | http://hdl.handle.net/10361/20196 |
相似書籍
-
V0.03 - Valuation of the redesigned lateral bracing system and relevant work
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023) -
Submission of bracing design of BRAC University new campus project
由: Brac University
出版: (2023) -
Letter of flush valve replacement
由: Tillotoma Gulshan
出版: (2023) -
BRAC Lirnb and Brace Fittrng Centre (BLBC): annual report, September 2000-August 2001
由: BRAC
出版: (2016) -
Note of discussion and decision
由: Brac University
出版: (2023)