Cushion replacement in the second reinforcement bracing base course
This record consists of general correspondence regarding cushion replacement in the second reinforcement bracing base course of BRAC University new campus project.
Tác giả chính: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Định dạng: | General correspondence |
Ngôn ngữ: | English |
Được phát hành: |
Brac University
2023
|
Những chủ đề: | |
Truy cập trực tuyến: | http://hdl.handle.net/10361/20196 |
Những quyển sách tương tự
Những quyển sách tương tự
-
V0.03 - Valuation of the redesigned lateral bracing system and relevant work
Bằng: BUCG-ABC Joint Venture (BUCG-ABC JV)
Được phát hành: (2023) -
Submission of bracing design of BRAC University new campus project
Bằng: Brac University
Được phát hành: (2023) -
Letter of flush valve replacement
Bằng: Tillotoma Gulshan
Được phát hành: (2023) -
BRAC Lirnb and Brace Fittrng Centre (BLBC): annual report, September 2000-August 2001
Bằng: BRAC
Được phát hành: (2016) -
Note of discussion and decision
Bằng: Brac University
Được phát hành: (2023)