Cushion replacement in the second reinforcement bracing base course
This record consists of general correspondence regarding cushion replacement in the second reinforcement bracing base course of BRAC University new campus project.
Главный автор: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Формат: | General correspondence |
Язык: | English |
Опубликовано: |
Brac University
2023
|
Предметы: | |
Online-ссылка: | http://hdl.handle.net/10361/20196 |
Схожие документы
-
V0.03 - Valuation of the redesigned lateral bracing system and relevant work
по: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубликовано: (2023) -
Submission of bracing design of BRAC University new campus project
по: Brac University
Опубликовано: (2023) -
Letter of flush valve replacement
по: Tillotoma Gulshan
Опубликовано: (2023) -
BRAC Lirnb and Brace Fittrng Centre (BLBC): annual report, September 2000-August 2001
по: BRAC
Опубликовано: (2016) -
Note of discussion and decision
по: Brac University
Опубликовано: (2023)