Cushion replacement in the second reinforcement bracing base course
This record consists of general correspondence regarding cushion replacement in the second reinforcement bracing base course of BRAC University new campus project.
Autor principal: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Formato: | General correspondence |
Idioma: | English |
Publicado em: |
Brac University
2023
|
Assuntos: | |
Acesso em linha: | http://hdl.handle.net/10361/20196 |
Registos relacionados
-
V0.03 - Valuation of the redesigned lateral bracing system and relevant work
Por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado em: (2023) -
Submission of bracing design of BRAC University new campus project
Por: Brac University
Publicado em: (2023) -
Letter of flush valve replacement
Por: Tillotoma Gulshan
Publicado em: (2023) -
BRAC Lirnb and Brace Fittrng Centre (BLBC): annual report, September 2000-August 2001
Por: BRAC
Publicado em: (2016) -
Note of discussion and decision
Por: Brac University
Publicado em: (2023)