Cushion replacement in the second reinforcement bracing base course
This record consists of general correspondence regarding cushion replacement in the second reinforcement bracing base course of BRAC University new campus project.
第一著者: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
フォーマット: | General correspondence |
言語: | English |
出版事項: |
Brac University
2023
|
主題: | |
オンライン・アクセス: | http://hdl.handle.net/10361/20196 |
類似資料
-
V0.03 - Valuation of the redesigned lateral bracing system and relevant work
著者:: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版事項: (2023) -
Submission of bracing design of BRAC University new campus project
著者:: Brac University
出版事項: (2023) -
Letter of flush valve replacement
著者:: Tillotoma Gulshan
出版事項: (2023) -
BRAC Lirnb and Brace Fittrng Centre (BLBC): annual report, September 2000-August 2001
著者:: BRAC
出版事項: (2016) -
Note of discussion and decision
著者:: Brac University
出版事項: (2023)