Cushion replacement in the second reinforcement bracing base course
This record consists of general correspondence regarding cushion replacement in the second reinforcement bracing base course of BRAC University new campus project.
Autor Principal: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Formato: | General correspondence |
Idioma: | English |
Publicado: |
Brac University
2023
|
Subjects: | |
Acceso en liña: | http://hdl.handle.net/10361/20196 |
Títulos similares
-
V0.03 - Valuation of the redesigned lateral bracing system and relevant work
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado: (2023) -
Submission of bracing design of BRAC University new campus project
por: Brac University
Publicado: (2023) -
Letter of flush valve replacement
por: Tillotoma Gulshan
Publicado: (2023) -
BRAC Lirnb and Brace Fittrng Centre (BLBC): annual report, September 2000-August 2001
por: BRAC
Publicado: (2016) -
Note of discussion and decision
por: Brac University
Publicado: (2023)