Cushion replacement in the second reinforcement bracing base course
This record consists of general correspondence regarding cushion replacement in the second reinforcement bracing base course of BRAC University new campus project.
1. Verfasser: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | General correspondence |
Sprache: | English |
Veröffentlicht: |
Brac University
2023
|
Schlagworte: | |
Online Zugang: | http://hdl.handle.net/10361/20196 |
Ähnliche Einträge
-
V0.03 - Valuation of the redesigned lateral bracing system and relevant work
von: BUCG-ABC Joint Venture (BUCG-ABC JV)
Veröffentlicht: (2023) -
Submission of bracing design of BRAC University new campus project
von: Brac University
Veröffentlicht: (2023) -
Letter of flush valve replacement
von: Tillotoma Gulshan
Veröffentlicht: (2023) -
BRAC Lirnb and Brace Fittrng Centre (BLBC): annual report, September 2000-August 2001
von: BRAC
Veröffentlicht: (2016) -
Note of discussion and decision
von: Brac University
Veröffentlicht: (2023)