Reasons for replacing brand of waterproof materials of BRAC University new campus project
This record consists of general correspondence regarding reasons for replacing brand of waterproof materials of BRAC University new campus project.
Príomhchruthaitheoir: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Formáid: | General correspondence |
Teanga: | English |
Foilsithe / Cruthaithe: |
Brac University
2023
|
Ábhair: | |
Rochtain ar líne: | http://hdl.handle.net/10361/20192 |
Míreanna comhchosúla
-
Regarding risks of waterproofing work for BRAC University new campus
de réir: BUCG-ABC Joint Venture (BUCG-ABC JV)
Foilsithe / Cruthaithe: (2023) -
Omitting waterproofing work in some areas of BRAC University new campus project
de réir: Brac University
Foilsithe / Cruthaithe: (2023) -
Re: Instruction on the type of waterproofing treatment to be done in different location
de réir: BUCG-ABC Joint Venture (BUCG-ABC JV)
Foilsithe / Cruthaithe: (2023) -
Regarding omitting waterproofing work in some areas of BRAC University new campus project
de réir: Brac University
Foilsithe / Cruthaithe: (2023) -
Instruction on the type of waterproofing treatment to be done in different location of BRAC University new campus project
de réir: Brac University
Foilsithe / Cruthaithe: (2023)