Reasons for replacing brand of waterproof materials of BRAC University new campus project
This record consists of general correspondence regarding reasons for replacing brand of waterproof materials of BRAC University new campus project.
المؤلف الرئيسي: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
التنسيق: | General correspondence |
اللغة: | English |
منشور في: |
Brac University
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10361/20192 |
مواد مشابهة
-
Regarding risks of waterproofing work for BRAC University new campus
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Omitting waterproofing work in some areas of BRAC University new campus project
بواسطة: Brac University
منشور في: (2023) -
Re: Instruction on the type of waterproofing treatment to be done in different location
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Regarding omitting waterproofing work in some areas of BRAC University new campus project
بواسطة: Brac University
منشور في: (2023) -
Instruction on the type of waterproofing treatment to be done in different location of BRAC University new campus project
بواسطة: Brac University
منشور في: (2023)