Reasons for replacing brand of waterproof materials of BRAC University new campus project
This record consists of general correspondence regarding reasons for replacing brand of waterproof materials of BRAC University new campus project.
主要作者: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
格式: | General correspondence |
语言: | English |
出版: |
Brac University
2023
|
主题: | |
在线阅读: | http://hdl.handle.net/10361/20192 |
相似书籍
-
Regarding risks of waterproofing work for BRAC University new campus
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023) -
Omitting waterproofing work in some areas of BRAC University new campus project
由: Brac University
出版: (2023) -
Re: Instruction on the type of waterproofing treatment to be done in different location
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023) -
Regarding omitting waterproofing work in some areas of BRAC University new campus project
由: Brac University
出版: (2023) -
Instruction on the type of waterproofing treatment to be done in different location of BRAC University new campus project
由: Brac University
出版: (2023)