VO#019 rain chain & cut-off ditch work
This record consists of general correspondence regarding rain chain & cut-off ditch work for BRACU new campus project.
主要作者: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
格式: | General correspondence |
语言: | English |
出版: |
Brac University
2023
|
主题: | |
在线阅读: | http://hdl.handle.net/10361/20185 |
相似书籍
-
Re: Instruction regarding VO#19 rain chain & cut-off ditch work
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023) -
Instruction regarding VO#019 rain chain & cut-off ditch work of BRAC University new campus project
由: Brac University
出版: (2023) -
Miscellaneous details for cut-off ditch in the south of utility building (RFA-364_Rev C)
由: WOHA Designs PTE LTD, et al.
出版: (2023) -
Cut-off ditch for UB (Architectural As Built Drawings)
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2024) -
Detail of copper rain chain (RFA-296_Rev A)
由: WOHA Designs PTE LTD, et al.
出版: (2023)