Requested to extend the period for submission of completed CAR documents
This record consists of general correspondence regarding the request to extend the period for submission of completed CAR (Contractor's All Risk) documents of BRACU new campus project.
1. autor: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | General correspondence |
Język: | English |
Wydane: |
Brac University
2023
|
Hasła przedmiotowe: | |
Dostęp online: | http://hdl.handle.net/10361/20171 |
Podobne zapisy
-
Request to separate completed temporary works from the CAR sum insured
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023) -
Submission of contractor's all risk (CAR) insurance
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023) -
Submission of contractor’s all risk (CAR) insurance
od: Brac University
Wydane: (2023) -
Resubmission of Contractor's All Risk (CAR) insurance
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023) -
Request to undertake part of Contractor's All Risk insurance premium
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023)