Final revision of quotation of the design of extra work
This record consists of general correspondence regarding final revision of quotation of the design of extra work of BRAC University new campus project.
Yazar: | BUCG |
---|---|
Materyal Türü: | General correspondence |
Dil: | English |
Baskı/Yayın Bilgisi: |
Brac University
2023
|
Konular: | |
Online Erişim: | http://hdl.handle.net/10361/20130 |
Benzer Materyaller
-
The quotation of the design of extra work
Yazar:: BUCG
Baskı/Yayın Bilgisi: (2023) -
Quotation for extra works for BRAC University new campus project
Yazar:: BUCG
Baskı/Yayın Bilgisi: (2023) -
Request for extension of time for quotation of extra works of BRAC University new campus project
Yazar:: BUCG-ABC Joint Venture (BUCG-ABC JV)
Baskı/Yayın Bilgisi: (2023) -
Request for quotations clarification for the extra works of BRAC University new campus project
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Rejection letter for submitted quotation of BUCG for the extra work of Brac University new campus project
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023)