VO#033 Proposal of extra works for water treatment plant system rev.01
This record consists of general correspondence regarding the revised submission of final proposal of cost amount against extra works for water treatment plant system that includes plant supply, transportation, installation etc. for BRACU new campus project.
主要作者: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
格式: | General correspondence |
語言: | English |
出版: |
Brac University
2023
|
主題: | |
在線閱讀: | http://hdl.handle.net/10361/20119 |
相似書籍
-
VO#033 Extra works for water treatment plant system rev.0
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023) -
VO#33 Proposal of extra works for water treatment plant system rev.01
由: Brac University
出版: (2023) -
Proposal for changing the item of work for water treatment plant system
由: BUCG-ABC Joint Venture
出版: (2023) -
Comparative exploration of ETP water of pharmaceutical companies in Bangladesh
由: Ara, Roushon
出版: (2018) -
Challenges of building a waste water treatment plant under PPP model at Gazipur, Bangladesh
由: Aziz, Ahmed
出版: (2024)