VO#033 Proposal of extra works for water treatment plant system rev.01
This record consists of general correspondence regarding the revised submission of final proposal of cost amount against extra works for water treatment plant system that includes plant supply, transportation, installation etc. for BRACU new campus project.
Автор: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Формат: | General correspondence |
Мова: | English |
Опубліковано: |
Brac University
2023
|
Предмети: | |
Онлайн доступ: | http://hdl.handle.net/10361/20119 |
Схожі ресурси
-
VO#033 Extra works for water treatment plant system rev.0
за авторством: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубліковано: (2023) -
VO#33 Proposal of extra works for water treatment plant system rev.01
за авторством: Brac University
Опубліковано: (2023) -
Proposal for changing the item of work for water treatment plant system
за авторством: BUCG-ABC Joint Venture
Опубліковано: (2023) -
Comparative exploration of ETP water of pharmaceutical companies in Bangladesh
за авторством: Ara, Roushon
Опубліковано: (2018) -
Challenges of building a waste water treatment plant under PPP model at Gazipur, Bangladesh
за авторством: Aziz, Ahmed
Опубліковано: (2024)