VO#033 Proposal of extra works for water treatment plant system rev.01
This record consists of general correspondence regarding the revised submission of final proposal of cost amount against extra works for water treatment plant system that includes plant supply, transportation, installation etc. for BRACU new campus project.
Yazar: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Materyal Türü: | General correspondence |
Dil: | English |
Baskı/Yayın Bilgisi: |
Brac University
2023
|
Konular: | |
Online Erişim: | http://hdl.handle.net/10361/20119 |
Benzer Materyaller
-
VO#033 Extra works for water treatment plant system rev.0
Yazar:: BUCG-ABC Joint Venture (BUCG-ABC JV)
Baskı/Yayın Bilgisi: (2023) -
VO#33 Proposal of extra works for water treatment plant system rev.01
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Proposal for changing the item of work for water treatment plant system
Yazar:: BUCG-ABC Joint Venture
Baskı/Yayın Bilgisi: (2023) -
Comparative exploration of ETP water of pharmaceutical companies in Bangladesh
Yazar:: Ara, Roushon
Baskı/Yayın Bilgisi: (2018) -
Challenges of building a waste water treatment plant under PPP model at Gazipur, Bangladesh
Yazar:: Aziz, Ahmed
Baskı/Yayın Bilgisi: (2024)