VO#033 Proposal of extra works for water treatment plant system rev.01
This record consists of general correspondence regarding the revised submission of final proposal of cost amount against extra works for water treatment plant system that includes plant supply, transportation, installation etc. for BRACU new campus project.
Главный автор: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Формат: | General correspondence |
Язык: | English |
Опубликовано: |
Brac University
2023
|
Предметы: | |
Online-ссылка: | http://hdl.handle.net/10361/20119 |
Схожие документы
-
VO#033 Extra works for water treatment plant system rev.0
по: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубликовано: (2023) -
VO#33 Proposal of extra works for water treatment plant system rev.01
по: Brac University
Опубликовано: (2023) -
Proposal for changing the item of work for water treatment plant system
по: BUCG-ABC Joint Venture
Опубликовано: (2023) -
Comparative exploration of ETP water of pharmaceutical companies in Bangladesh
по: Ara, Roushon
Опубликовано: (2018) -
Challenges of building a waste water treatment plant under PPP model at Gazipur, Bangladesh
по: Aziz, Ahmed
Опубликовано: (2024)