VO#033 Proposal of extra works for water treatment plant system rev.01
This record consists of general correspondence regarding the revised submission of final proposal of cost amount against extra works for water treatment plant system that includes plant supply, transportation, installation etc. for BRACU new campus project.
Autor principal: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Formato: | General correspondence |
Idioma: | English |
Publicado em: |
Brac University
2023
|
Assuntos: | |
Acesso em linha: | http://hdl.handle.net/10361/20119 |
Registos relacionados
-
VO#033 Extra works for water treatment plant system rev.0
Por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado em: (2023) -
VO#33 Proposal of extra works for water treatment plant system rev.01
Por: Brac University
Publicado em: (2023) -
Proposal for changing the item of work for water treatment plant system
Por: BUCG-ABC Joint Venture
Publicado em: (2023) -
Comparative exploration of ETP water of pharmaceutical companies in Bangladesh
Por: Ara, Roushon
Publicado em: (2018) -
Challenges of building a waste water treatment plant under PPP model at Gazipur, Bangladesh
Por: Aziz, Ahmed
Publicado em: (2024)