VO#033 Proposal of extra works for water treatment plant system rev.01
This record consists of general correspondence regarding the revised submission of final proposal of cost amount against extra works for water treatment plant system that includes plant supply, transportation, installation etc. for BRACU new campus project.
1. autor: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | General correspondence |
Język: | English |
Wydane: |
Brac University
2023
|
Hasła przedmiotowe: | |
Dostęp online: | http://hdl.handle.net/10361/20119 |
Podobne zapisy
-
VO#033 Extra works for water treatment plant system rev.0
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023) -
VO#33 Proposal of extra works for water treatment plant system rev.01
od: Brac University
Wydane: (2023) -
Proposal for changing the item of work for water treatment plant system
od: BUCG-ABC Joint Venture
Wydane: (2023) -
Comparative exploration of ETP water of pharmaceutical companies in Bangladesh
od: Ara, Roushon
Wydane: (2018) -
Challenges of building a waste water treatment plant under PPP model at Gazipur, Bangladesh
od: Aziz, Ahmed
Wydane: (2024)