VO#033 Proposal of extra works for water treatment plant system rev.01
This record consists of general correspondence regarding the revised submission of final proposal of cost amount against extra works for water treatment plant system that includes plant supply, transportation, installation etc. for BRACU new campus project.
第一著者: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
フォーマット: | General correspondence |
言語: | English |
出版事項: |
Brac University
2023
|
主題: | |
オンライン・アクセス: | http://hdl.handle.net/10361/20119 |
類似資料
-
VO#033 Extra works for water treatment plant system rev.0
著者:: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版事項: (2023) -
VO#33 Proposal of extra works for water treatment plant system rev.01
著者:: Brac University
出版事項: (2023) -
Proposal for changing the item of work for water treatment plant system
著者:: BUCG-ABC Joint Venture
出版事項: (2023) -
Comparative exploration of ETP water of pharmaceutical companies in Bangladesh
著者:: Ara, Roushon
出版事項: (2018) -
Challenges of building a waste water treatment plant under PPP model at Gazipur, Bangladesh
著者:: Aziz, Ahmed
出版事項: (2024)