VO#033 Proposal of extra works for water treatment plant system rev.01
This record consists of general correspondence regarding the revised submission of final proposal of cost amount against extra works for water treatment plant system that includes plant supply, transportation, installation etc. for BRACU new campus project.
Príomhchruthaitheoir: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Formáid: | General correspondence |
Teanga: | English |
Foilsithe / Cruthaithe: |
Brac University
2023
|
Ábhair: | |
Rochtain ar líne: | http://hdl.handle.net/10361/20119 |
Míreanna comhchosúla
-
VO#033 Extra works for water treatment plant system rev.0
de réir: BUCG-ABC Joint Venture (BUCG-ABC JV)
Foilsithe / Cruthaithe: (2023) -
VO#33 Proposal of extra works for water treatment plant system rev.01
de réir: Brac University
Foilsithe / Cruthaithe: (2023) -
Proposal for changing the item of work for water treatment plant system
de réir: BUCG-ABC Joint Venture
Foilsithe / Cruthaithe: (2023) -
Comparative exploration of ETP water of pharmaceutical companies in Bangladesh
de réir: Ara, Roushon
Foilsithe / Cruthaithe: (2018) -
Challenges of building a waste water treatment plant under PPP model at Gazipur, Bangladesh
de réir: Aziz, Ahmed
Foilsithe / Cruthaithe: (2024)