VO#033 Proposal of extra works for water treatment plant system rev.01
This record consists of general correspondence regarding the revised submission of final proposal of cost amount against extra works for water treatment plant system that includes plant supply, transportation, installation etc. for BRACU new campus project.
Κύριος συγγραφέας: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Μορφή: | General correspondence |
Γλώσσα: | English |
Έκδοση: |
Brac University
2023
|
Θέματα: | |
Διαθέσιμο Online: | http://hdl.handle.net/10361/20119 |
Παρόμοια τεκμήρια
-
VO#033 Extra works for water treatment plant system rev.0
ανά: BUCG-ABC Joint Venture (BUCG-ABC JV)
Έκδοση: (2023) -
VO#33 Proposal of extra works for water treatment plant system rev.01
ανά: Brac University
Έκδοση: (2023) -
Proposal for changing the item of work for water treatment plant system
ανά: BUCG-ABC Joint Venture
Έκδοση: (2023) -
Comparative exploration of ETP water of pharmaceutical companies in Bangladesh
ανά: Ara, Roushon
Έκδοση: (2018) -
Challenges of building a waste water treatment plant under PPP model at Gazipur, Bangladesh
ανά: Aziz, Ahmed
Έκδοση: (2024)