VO#033 Proposal of extra works for water treatment plant system rev.01
This record consists of general correspondence regarding the revised submission of final proposal of cost amount against extra works for water treatment plant system that includes plant supply, transportation, installation etc. for BRACU new campus project.
Hovedforfatter: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | General correspondence |
Sprog: | English |
Udgivet: |
Brac University
2023
|
Fag: | |
Online adgang: | http://hdl.handle.net/10361/20119 |
Lignende værker
-
VO#033 Extra works for water treatment plant system rev.0
af: BUCG-ABC Joint Venture (BUCG-ABC JV)
Udgivet: (2023) -
VO#33 Proposal of extra works for water treatment plant system rev.01
af: Brac University
Udgivet: (2023) -
Proposal for changing the item of work for water treatment plant system
af: BUCG-ABC Joint Venture
Udgivet: (2023) -
Comparative exploration of ETP water of pharmaceutical companies in Bangladesh
af: Ara, Roushon
Udgivet: (2018) -
Challenges of building a waste water treatment plant under PPP model at Gazipur, Bangladesh
af: Aziz, Ahmed
Udgivet: (2024)