VO#033 Proposal of extra works for water treatment plant system rev.01
This record consists of general correspondence regarding the revised submission of final proposal of cost amount against extra works for water treatment plant system that includes plant supply, transportation, installation etc. for BRACU new campus project.
প্রধান লেখক: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
বিন্যাস: | General correspondence |
ভাষা: | English |
প্রকাশিত: |
Brac University
2023
|
বিষয়গুলি: | |
অনলাইন ব্যবহার করুন: | http://hdl.handle.net/10361/20119 |
অনুরূপ উপাদানগুলি
-
VO#033 Extra works for water treatment plant system rev.0
অনুযায়ী: BUCG-ABC Joint Venture (BUCG-ABC JV)
প্রকাশিত: (2023) -
VO#33 Proposal of extra works for water treatment plant system rev.01
অনুযায়ী: Brac University
প্রকাশিত: (2023) -
Proposal for changing the item of work for water treatment plant system
অনুযায়ী: BUCG-ABC Joint Venture
প্রকাশিত: (2023) -
Comparative exploration of ETP water of pharmaceutical companies in Bangladesh
অনুযায়ী: Ara, Roushon
প্রকাশিত: (2018) -
Challenges of building a waste water treatment plant under PPP model at Gazipur, Bangladesh
অনুযায়ী: Aziz, Ahmed
প্রকাশিত: (2024)