VO#033 Proposal of extra works for water treatment plant system rev.01
This record consists of general correspondence regarding the revised submission of final proposal of cost amount against extra works for water treatment plant system that includes plant supply, transportation, installation etc. for BRACU new campus project.
المؤلف الرئيسي: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
التنسيق: | General correspondence |
اللغة: | English |
منشور في: |
Brac University
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10361/20119 |
مواد مشابهة
-
VO#033 Extra works for water treatment plant system rev.0
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
VO#33 Proposal of extra works for water treatment plant system rev.01
بواسطة: Brac University
منشور في: (2023) -
Proposal for changing the item of work for water treatment plant system
بواسطة: BUCG-ABC Joint Venture
منشور في: (2023) -
Comparative exploration of ETP water of pharmaceutical companies in Bangladesh
بواسطة: Ara, Roushon
منشور في: (2018) -
Challenges of building a waste water treatment plant under PPP model at Gazipur, Bangladesh
بواسطة: Aziz, Ahmed
منشور في: (2024)