Evaluation for additional work of shoring pile work in zone B
This record consists of general correspondence regarding the evaluation for additional work of shoring pile work in zone B of BRACU new campus project site
المؤلف الرئيسي: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
التنسيق: | General correspondence |
اللغة: | English |
منشور في: |
Brac University
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10361/20112 |
مواد مشابهة
-
Evaluation for additional work of shoring pile work in zone B
بواسطة: BUCG-ABC Joint Venture
منشور في: (2023) -
Response to the engineer’s reply concerning evaluation for additional work of sharing pile work in zone B
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Evaluation for additional work of shoring pile work between zone B
بواسطة: Brac University
منشور في: (2023) -
Evaluation for additional work of shoring pile work between zone A and C
بواسطة: Brac University
منشور في: (2023) -
VO#028 Proposal of shoring pile works at zone C
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023)