Clarification meeting regarding design issues of BRAC University new campus project
This record consists of general correspondence regarding clarification meeting regarding design issues of BRAC University new campus project.
主要作者: | BUCG |
---|---|
格式: | General correspondence |
語言: | English |
出版: |
Brac University
2023
|
主題: | |
在線閱讀: | http://hdl.handle.net/10361/20110 |
相似書籍
-
Request for clarification regarding drawing of extra works of BRAC University new campus project
由: BUCG
出版: (2023) -
Clarification on the architectural wall in substructure of BRAC University new campus project
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023) -
Clarification for the master construction schedule of BRAC University new campus project
由: BUCG-ABC Joint Venture
出版: (2023) -
Clarification on material grade change for prefabricated steel structure of BRAC University new campus project
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023) -
Clarification on quotation for additional wall attached to diaphragm wall of BRAC University new campus project
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023)