Clarification meeting regarding design issues of BRAC University new campus project
This record consists of general correspondence regarding clarification meeting regarding design issues of BRAC University new campus project.
Tác giả chính: | BUCG |
---|---|
Định dạng: | General correspondence |
Ngôn ngữ: | English |
Được phát hành: |
Brac University
2023
|
Những chủ đề: | |
Truy cập trực tuyến: | http://hdl.handle.net/10361/20110 |
Những quyển sách tương tự
-
Request for clarification regarding drawing of extra works of BRAC University new campus project
Bằng: BUCG
Được phát hành: (2023) -
Clarification on the architectural wall in substructure of BRAC University new campus project
Bằng: BUCG-ABC Joint Venture (BUCG-ABC JV)
Được phát hành: (2023) -
Clarification for the master construction schedule of BRAC University new campus project
Bằng: BUCG-ABC Joint Venture
Được phát hành: (2023) -
Clarification on material grade change for prefabricated steel structure of BRAC University new campus project
Bằng: BUCG-ABC Joint Venture (BUCG-ABC JV)
Được phát hành: (2023) -
Clarification on quotation for additional wall attached to diaphragm wall of BRAC University new campus project
Bằng: BUCG-ABC Joint Venture (BUCG-ABC JV)
Được phát hành: (2023)