Clarification meeting regarding design issues of BRAC University new campus project
This record consists of general correspondence regarding clarification meeting regarding design issues of BRAC University new campus project.
Главный автор: | BUCG |
---|---|
Формат: | General correspondence |
Язык: | English |
Опубликовано: |
Brac University
2023
|
Предметы: | |
Online-ссылка: | http://hdl.handle.net/10361/20110 |
Схожие документы
-
Request for clarification regarding drawing of extra works of BRAC University new campus project
по: BUCG
Опубликовано: (2023) -
Clarification on the architectural wall in substructure of BRAC University new campus project
по: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубликовано: (2023) -
Clarification for the master construction schedule of BRAC University new campus project
по: BUCG-ABC Joint Venture
Опубликовано: (2023) -
Clarification on material grade change for prefabricated steel structure of BRAC University new campus project
по: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубликовано: (2023) -
Clarification on quotation for additional wall attached to diaphragm wall of BRAC University new campus project
по: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубликовано: (2023)