Clarification meeting regarding design issues of BRAC University new campus project
This record consists of general correspondence regarding clarification meeting regarding design issues of BRAC University new campus project.
Autor principal: | BUCG |
---|---|
Formato: | General correspondence |
Idioma: | English |
Publicado em: |
Brac University
2023
|
Assuntos: | |
Acesso em linha: | http://hdl.handle.net/10361/20110 |
Registros relacionados
-
Request for clarification regarding drawing of extra works of BRAC University new campus project
por: BUCG
Publicado em: (2023) -
Clarification on the architectural wall in substructure of BRAC University new campus project
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado em: (2023) -
Clarification for the master construction schedule of BRAC University new campus project
por: BUCG-ABC Joint Venture
Publicado em: (2023) -
Clarification on material grade change for prefabricated steel structure of BRAC University new campus project
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado em: (2023) -
Clarification on quotation for additional wall attached to diaphragm wall of BRAC University new campus project
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado em: (2023)