Clarification meeting regarding design issues of BRAC University new campus project
This record consists of general correspondence regarding clarification meeting regarding design issues of BRAC University new campus project.
1. autor: | BUCG |
---|---|
Format: | General correspondence |
Język: | English |
Wydane: |
Brac University
2023
|
Hasła przedmiotowe: | |
Dostęp online: | http://hdl.handle.net/10361/20110 |
Podobne zapisy
-
Request for clarification regarding drawing of extra works of BRAC University new campus project
od: BUCG
Wydane: (2023) -
Clarification on the architectural wall in substructure of BRAC University new campus project
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023) -
Clarification for the master construction schedule of BRAC University new campus project
od: BUCG-ABC Joint Venture
Wydane: (2023) -
Clarification on material grade change for prefabricated steel structure of BRAC University new campus project
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023) -
Clarification on quotation for additional wall attached to diaphragm wall of BRAC University new campus project
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023)