Clarification meeting regarding design issues of BRAC University new campus project
This record consists of general correspondence regarding clarification meeting regarding design issues of BRAC University new campus project.
Hoofdauteur: | BUCG |
---|---|
Formaat: | General correspondence |
Taal: | English |
Gepubliceerd in: |
Brac University
2023
|
Onderwerpen: | |
Online toegang: | http://hdl.handle.net/10361/20110 |
Gelijkaardige items
-
Request for clarification regarding drawing of extra works of BRAC University new campus project
door: BUCG
Gepubliceerd in: (2023) -
Clarification on the architectural wall in substructure of BRAC University new campus project
door: BUCG-ABC Joint Venture (BUCG-ABC JV)
Gepubliceerd in: (2023) -
Clarification for the master construction schedule of BRAC University new campus project
door: BUCG-ABC Joint Venture
Gepubliceerd in: (2023) -
Clarification on material grade change for prefabricated steel structure of BRAC University new campus project
door: BUCG-ABC Joint Venture (BUCG-ABC JV)
Gepubliceerd in: (2023) -
Clarification on quotation for additional wall attached to diaphragm wall of BRAC University new campus project
door: BUCG-ABC Joint Venture (BUCG-ABC JV)
Gepubliceerd in: (2023)