Clarification meeting regarding design issues of BRAC University new campus project
This record consists of general correspondence regarding clarification meeting regarding design issues of BRAC University new campus project.
Autore principale: | BUCG |
---|---|
Natura: | General correspondence |
Lingua: | English |
Pubblicazione: |
Brac University
2023
|
Soggetti: | |
Accesso online: | http://hdl.handle.net/10361/20110 |
Documenti analoghi
-
Request for clarification regarding drawing of extra works of BRAC University new campus project
di: BUCG
Pubblicazione: (2023) -
Clarification on the architectural wall in substructure of BRAC University new campus project
di: BUCG-ABC Joint Venture (BUCG-ABC JV)
Pubblicazione: (2023) -
Clarification for the master construction schedule of BRAC University new campus project
di: BUCG-ABC Joint Venture
Pubblicazione: (2023) -
Clarification on material grade change for prefabricated steel structure of BRAC University new campus project
di: BUCG-ABC Joint Venture (BUCG-ABC JV)
Pubblicazione: (2023) -
Clarification on quotation for additional wall attached to diaphragm wall of BRAC University new campus project
di: BUCG-ABC Joint Venture (BUCG-ABC JV)
Pubblicazione: (2023)