Clarification meeting regarding design issues of BRAC University new campus project
This record consists of general correspondence regarding clarification meeting regarding design issues of BRAC University new campus project.
Main Author: | BUCG |
---|---|
Format: | General correspondence |
Language: | English |
Published: |
Brac University
2023
|
Subjects: | |
Online Access: | http://hdl.handle.net/10361/20110 |
Similar Items
-
Request for clarification regarding drawing of extra works of BRAC University new campus project
by: BUCG
Published: (2023) -
Clarification on the architectural wall in substructure of BRAC University new campus project
by: BUCG-ABC Joint Venture (BUCG-ABC JV)
Published: (2023) -
Clarification for the master construction schedule of BRAC University new campus project
by: BUCG-ABC Joint Venture
Published: (2023) -
Clarification on material grade change for prefabricated steel structure of BRAC University new campus project
by: BUCG-ABC Joint Venture (BUCG-ABC JV)
Published: (2023) -
Clarification on quotation for additional wall attached to diaphragm wall of BRAC University new campus project
by: BUCG-ABC Joint Venture (BUCG-ABC JV)
Published: (2023)