Clarification meeting regarding design issues of BRAC University new campus project
This record consists of general correspondence regarding clarification meeting regarding design issues of BRAC University new campus project.
Prif Awdur: | BUCG |
---|---|
Fformat: | General correspondence |
Iaith: | English |
Cyhoeddwyd: |
Brac University
2023
|
Pynciau: | |
Mynediad Ar-lein: | http://hdl.handle.net/10361/20110 |
Eitemau Tebyg
-
Request for clarification regarding drawing of extra works of BRAC University new campus project
gan: BUCG
Cyhoeddwyd: (2023) -
Clarification on the architectural wall in substructure of BRAC University new campus project
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023) -
Clarification for the master construction schedule of BRAC University new campus project
gan: BUCG-ABC Joint Venture
Cyhoeddwyd: (2023) -
Clarification on material grade change for prefabricated steel structure of BRAC University new campus project
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023) -
Clarification on quotation for additional wall attached to diaphragm wall of BRAC University new campus project
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023)