Clarification meeting regarding design issues of BRAC University new campus project
This record consists of general correspondence regarding clarification meeting regarding design issues of BRAC University new campus project.
المؤلف الرئيسي: | BUCG |
---|---|
التنسيق: | General correspondence |
اللغة: | English |
منشور في: |
Brac University
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10361/20110 |
مواد مشابهة
-
Request for clarification regarding drawing of extra works of BRAC University new campus project
بواسطة: BUCG
منشور في: (2023) -
Clarification on the architectural wall in substructure of BRAC University new campus project
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Clarification for the master construction schedule of BRAC University new campus project
بواسطة: BUCG-ABC Joint Venture
منشور في: (2023) -
Clarification on material grade change for prefabricated steel structure of BRAC University new campus project
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Clarification on quotation for additional wall attached to diaphragm wall of BRAC University new campus project
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023)