Clarification meeting regarding design issues of BRAC University new campus project
This record consists of general correspondence regarding clarification meeting regarding design issues of BRAC University new campus project.
| Autor principal: | BUCG |
|---|---|
| Formato: | General correspondence |
| Lenguaje: | English |
| Publicado: |
Brac University
2023
|
| Materias: | |
| Acceso en línea: | http://hdl.handle.net/10361/20110 |
Ejemplares similares
-
Request for clarification regarding drawing of extra works of BRAC University new campus project
por: BUCG
Publicado: (2023) -
Clarification on the architectural wall in substructure of BRAC University new campus project
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado: (2023) -
Clarification for the master construction schedule of BRAC University new campus project
por: BUCG-ABC Joint Venture
Publicado: (2023) -
Clarification on material grade change for prefabricated steel structure of BRAC University new campus project
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado: (2023) -
Clarification on quotation for additional wall attached to diaphragm wall of BRAC University new campus project
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado: (2023)