Clarification meeting regarding design issues of BRAC University new campus project
This record consists of general correspondence regarding clarification meeting regarding design issues of BRAC University new campus project.
| Prif Awdur: | BUCG |
|---|---|
| Fformat: | General correspondence |
| Iaith: | English |
| Cyhoeddwyd: |
Brac University
2023
|
| Pynciau: | |
| Mynediad Ar-lein: | http://hdl.handle.net/10361/20110 |
Eitemau Tebyg
-
Request for clarification regarding drawing of extra works of BRAC University new campus project
gan: BUCG
Cyhoeddwyd: (2023) -
Clarification on the architectural wall in substructure of BRAC University new campus project
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023) -
Clarification for the master construction schedule of BRAC University new campus project
gan: BUCG-ABC Joint Venture
Cyhoeddwyd: (2023) -
Clarification on material grade change for prefabricated steel structure of BRAC University new campus project
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023) -
Clarification on quotation for additional wall attached to diaphragm wall of BRAC University new campus project
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023)