Issuing NCR (Non-conformance report) for BRACU new campus project
This record consists of general correspondence regarding the structural steel works from 6th to 12th floor of BRACU new campus project site
Tác giả chính: | Brac University |
---|---|
Định dạng: | Other |
Ngôn ngữ: | English |
Được phát hành: |
Brac University
2023
|
Những chủ đề: | |
Truy cập trực tuyến: | http://hdl.handle.net/10361/20094 |
Những quyển sách tương tự
-
Request to open new work order for the steel structure work of BRAC University new campus project
Bằng: BUCG-ABC Joint Venture
Được phát hành: (2023) -
Regarding confirming remaining steel structure materials of BRAC University new campus project
Bằng: Brac University
Được phát hành: (2023) -
The engineer’s instruction to complete steel structure works
Bằng: Brac University
Được phát hành: (2023) -
Submission inspection checklist for concreting, structural steel and other major works of BRAC University new campus project
Bằng: BUCG-ABC Joint Venture (BUCG-ABC JV)
Được phát hành: (2023) -
Regarding transporting the steel structure of zone C outside of BRAC University new campus project
Bằng: BUCG-ABC Joint Venture (BUCG-ABC JV)
Được phát hành: (2023)