Issuing NCR (Non-conformance report) for BRACU new campus project
This record consists of general correspondence regarding the structural steel works from 6th to 12th floor of BRACU new campus project site
Yazar: | Brac University |
---|---|
Materyal Türü: | Other |
Dil: | English |
Baskı/Yayın Bilgisi: |
Brac University
2023
|
Konular: | |
Online Erişim: | http://hdl.handle.net/10361/20094 |
Benzer Materyaller
-
Request to open new work order for the steel structure work of BRAC University new campus project
Yazar:: BUCG-ABC Joint Venture
Baskı/Yayın Bilgisi: (2023) -
Regarding confirming remaining steel structure materials of BRAC University new campus project
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
The engineer’s instruction to complete steel structure works
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Submission inspection checklist for concreting, structural steel and other major works of BRAC University new campus project
Yazar:: BUCG-ABC Joint Venture (BUCG-ABC JV)
Baskı/Yayın Bilgisi: (2023) -
Regarding transporting the steel structure of zone C outside of BRAC University new campus project
Yazar:: BUCG-ABC Joint Venture (BUCG-ABC JV)
Baskı/Yayın Bilgisi: (2023)