Issuing NCR (Non-conformance report) for BRACU new campus project
This record consists of general correspondence regarding the structural steel works from 6th to 12th floor of BRACU new campus project site
1. autor: | Brac University |
---|---|
Format: | Other |
Język: | English |
Wydane: |
Brac University
2023
|
Hasła przedmiotowe: | |
Dostęp online: | http://hdl.handle.net/10361/20094 |
Podobne zapisy
-
Request to open new work order for the steel structure work of BRAC University new campus project
od: BUCG-ABC Joint Venture
Wydane: (2023) -
Regarding confirming remaining steel structure materials of BRAC University new campus project
od: Brac University
Wydane: (2023) -
The engineer’s instruction to complete steel structure works
od: Brac University
Wydane: (2023) -
Submission inspection checklist for concreting, structural steel and other major works of BRAC University new campus project
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023) -
Regarding transporting the steel structure of zone C outside of BRAC University new campus project
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023)