Issuing NCR (Non-conformance report) for BRACU new campus project
This record consists of general correspondence regarding the structural steel works from 6th to 12th floor of BRACU new campus project site
Auteur principal: | Brac University |
---|---|
Format: | Other |
Langue: | English |
Publié: |
Brac University
2023
|
Sujets: | |
Accès en ligne: | http://hdl.handle.net/10361/20094 |
Documents similaires
-
Request to open new work order for the steel structure work of BRAC University new campus project
par: BUCG-ABC Joint Venture
Publié: (2023) -
Regarding confirming remaining steel structure materials of BRAC University new campus project
par: Brac University
Publié: (2023) -
The engineer’s instruction to complete steel structure works
par: Brac University
Publié: (2023) -
Submission inspection checklist for concreting, structural steel and other major works of BRAC University new campus project
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2023) -
Regarding transporting the steel structure of zone C outside of BRAC University new campus project
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2023)