Issuing NCR (Non-conformance report) for BRACU new campus project
This record consists of general correspondence regarding the structural steel works from 6th to 12th floor of BRACU new campus project site
Prif Awdur: | Brac University |
---|---|
Fformat: | Other |
Iaith: | English |
Cyhoeddwyd: |
Brac University
2023
|
Pynciau: | |
Mynediad Ar-lein: | http://hdl.handle.net/10361/20094 |
Eitemau Tebyg
-
Request to open new work order for the steel structure work of BRAC University new campus project
gan: BUCG-ABC Joint Venture
Cyhoeddwyd: (2023) -
Regarding confirming remaining steel structure materials of BRAC University new campus project
gan: Brac University
Cyhoeddwyd: (2023) -
The engineer’s instruction to complete steel structure works
gan: Brac University
Cyhoeddwyd: (2023) -
Submission inspection checklist for concreting, structural steel and other major works of BRAC University new campus project
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023) -
Regarding transporting the steel structure of zone C outside of BRAC University new campus project
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023)