Issuing NCR (Non-conformance report) for BRACU new campus project
This record consists of general correspondence regarding the structural steel works from 6th to 12th floor of BRACU new campus project site
المؤلف الرئيسي: | Brac University |
---|---|
التنسيق: | Other |
اللغة: | English |
منشور في: |
Brac University
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10361/20094 |
مواد مشابهة
-
Request to open new work order for the steel structure work of BRAC University new campus project
بواسطة: BUCG-ABC Joint Venture
منشور في: (2023) -
Regarding confirming remaining steel structure materials of BRAC University new campus project
بواسطة: Brac University
منشور في: (2023) -
The engineer’s instruction to complete steel structure works
بواسطة: Brac University
منشور في: (2023) -
Submission inspection checklist for concreting, structural steel and other major works of BRAC University new campus project
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Regarding transporting the steel structure of zone C outside of BRAC University new campus project
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023)